General Notes -
| Rack Slot | Device | Additional Notes |
|---|---|---|
| 1 | RJ45 Backplane | From Wall sockets |
| 2 | RJ45 Backplane | From Wall sockets |
| 3 & 4 | Tata Power Supply | 2U power supply for Tata Devices |
| 5 | Empty | |
| 6 | Tata Device 1 | For TATA please connect the port as they are already connected. i.e. do not change ports |
| 7 | Empty | |
| 8 | Tata Device 2 | For TATA please connect the port as they are already connected. i.e. do not change ports |
| 8 | Empty | |
| 9 | Core Router: TP Link ER8411 | Please maintain existing port configuration: |
Port 2: SFP Fiber uplink to Switch 1 Port 4: Airtel Broadband Port 5: TATA ILL Port 6: TATA SIP
Nothing else should be connected to router | | 10 | Empty | | | 11 | Switch 1: Existing TPLink XG3428XMP | Please maintain below port configuration Ports 1-24: For LAN and Wall Socket Ports Port 25: SFP fiber in from Core Router Port 26: SFP Fiber to **ccnp-n1.servers.cloops.in** (new HPE rack server) Port 27: Empty Port 28: SFP Fiber uplink to switch 2. | | 12 | Switch 2: New TPLink XG3428XMP | *important: Please let me know it’s serial number for configuration on omada cloud controller.
Please maintain below port configuration Ports 1-24: For LAN and wall socket ports Port 25: SFP in from switch 1 port 26: SFP fiber to conp-n2.servers.cloops.in (2nd server that we will purchase) | | 13 | Empty | | | 14 | ccnp-n1.servers.cloops.in (New HPE Rack Server) | Please connect following network ports - HPE ILO Management Port: Switch 1 any available port. Broadcom Fiber Port 1: Switch 1 Port 26 (SFP) | | 16 | Empty | | | 17 | ccnp-n2.servers.cloops.in (to be purchased) | Please have the cables ready following network ports - HPE ILO Management Port: Switch 2 any available port. Broadcom Fiber Port 1: Switch 2 Port 26 (SFP)
So that when purchased , we’ll just connect cables and nothing else is required |
Any miscellaneous things. e.g. TATA batteries etc. can be put near the bottom of the rack.